Analysis of installation process of pneumatic diaphragm pump

Views: Update time:2021-01-19

Analysis of installation process of pneumatic diaphragm pump

1. Pneumatic diaphragm pump installation and start: the diaphragm pump should be placed as close to the product as possible, so that the suction line is the shortest, the number of configuration parts is reduced, and the pipeline specification should not be reduced. In order to prolong the service life of the diaphragm, the pump should be close to the pumped liquid as far as possible. When the inlet pressure exceeds 3M liquid column, a set of pressure relief adjustment device should be installed to prolong the service life of the diaphragm. If a hard pipe is installed, use a short hose between the pump and the pipe. The hose can slow down the vibration and distortion of the pipeline, and a surge tank is recommended to further reduce the pulse in the fluid.

2. Gas supply to diaphragm pump: the gas supply pressure of metal diaphragm pump shall not exceed 125psi, and that of plastic pump shall not exceed 100psi. Connect the air inlet of the pump to the air source with enough capacity and pressure to meet the design requirements. If the air supply line is a hard pipe, connect a short hose between the pump and the pipe to reduce distortion. In addition to the cover of air intake, the weight of air intake pipe and pressure regulating filter must also be supported by some means. If the pipe is not supported, the pump may be damaged. A pressure regulating valve must be installed to ensure that the supply pressure does not exceed the specified range.

3. Inspection before diaphragm pump operation: before diaphragm pump operation, check all fixtures to prevent looseness, tighten loose parts to avoid leakage, and fix them with the method described in the card attached with the pump.

4. Diaphragm pump intake and start: start, the air valve open about 1 / 2 to 3 / 4 turn. After the pump starts, open the air valve to increase the air flow to achieve the required flow.

5. Pneumatic diaphragm pump exhaust: if the diaphragm is broken, the extracted liquid or gas will enter the air port of the pump and be discharged into the atmosphere. When extracting dangerous or toxic substances, the pipeline needs to be discharged to a suitable place for safety treatment. If the pump is immersed in liquid, the gas shall be discharged from the liquid surface, and the exhaust pipe shall not be less than 1 "(2.45cm). Reducing the size of the exhaust pipe will limit the gas flow and reduce the utilization rate of the pump. When the material level is higher than the pump, the discharge outlet should be higher to prevent siphon. At a certain temperature and humidity, the discharged gas may freeze up, and the use of gas drying can eliminate most of these problems.

6. After use of pneumatic diaphragm pump: if it is used to transport easily solidified substances, in order to prevent damage to the pump, clean the pump thoroughly after each use. (after use, the product left in the pump has dried or stuck to the pump, which will cause problems with the diaphragm and valve before the next start). In freezing temperature, the pump must be drained after use in any case.

Analysis of installation process of pneumatic diaphragm pump(圖1)

Shenzhen great tower Industrial Co., Ltd. is a manufacturer of pneumatic diaphragm pump integrating R & D, production, sales and after-sales service. Its products are widely used in domestic and foreign chemical plants, shipyards, paint plants, water treatment plants, automobile manufacturers and other units. It is a domestic enterprise with higher requirements for the process quality of pneumatic diaphragm pump products, and its technical indicators surpass those of similar domestic products. The main products are aluminum alloy pneumatic diaphragm pump, cast iron pneumatic diaphragm pump, stainless steel pneumatic diaphragm pump, polypropylene pneumatic diaphragm pump, powder pump, high pressure pump, pneumatic diaphragm pump accessories, etc.


Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

粵ICP備2020110751號

主站蜘蛛池模板: 成 年 人 黄 色 大 片大 全| 免费看成人aa片无码视频羞羞网| 小雪第一次交换又粗又大老杨| 日本强好片久久久久久aaa| 粉嫩少妇内射浓精videos| 日本少妇又色又爽又高潮| 性中国熟妇videofreesex| 插插无码视频大全不卡网站| 国产成人精品一区二区三区免费| 国产乱人激情h在线观看| 99久久成人国产精品免费| 国产精品一区二区av交换| 特大黑人娇小亚洲女| 免费观看一区二区三区| 久久国产欧美日韩精品图片| 疯狂迎合进入强壮公的视频| 在线观看国产一区二区三区| 国产午夜无码视频在线观看| 亚洲 卡通 欧美 制服 中文| 男人的天堂av网站| 99久9在线 | 免费| 99久久精品免费看国产| 精品一区二区三区四区五区六区| 久久99精品久久久久久清纯| 日日噜噜噜夜夜爽爽狠狠视频 | 天天做天天爱夜夜爽毛片毛片| 让少妇高潮无乱码高清在线观看| 亚洲欧洲∨国产一区二区三区 | 精品欧洲av无码一区二区| 最新日韩精品中文字幕| 久久99国产精品久久99| 丁香花在线影院观看在线播放| 国产成人无码a区视频在线观看| 日日天干夜夜狠狠爱| 妇女性内射冈站hdwwwooo| 99爱国产精品免费高清在线 | 亚洲欧美国产精品专区久久| 2021在线精品自偷自拍无码| 国产免费毛卡片| 疯狂三人交性欧美| 精品人妻无码一区二区色欲产成人 |